Construction

Road Base Calculator

Calculate Class-2 road base by area, depth, and compaction. Includes tons, truckloads, and cost.

Inputs

Live estimate

Material needed

11.87 cu yd

Schedule 1 truck load(calculated: 0.99)
Cubic yards
11.87 cu yd
Tons
18.4 tons
Truckloads
0.99
Area
500 sq ft
Cubic feet
250

You will likely need

  • 11.87 cu yd — material needed
  • Schedule 1 truck load
  • Approximate delivered weight: 18.4 tons

Supplier tip

Most suppliers sell road base by either the cubic yard or by weight. Confirm your supplier's preferred ordering unit before purchasing.

Weight estimates are based on industry-standard average material densities. Actual delivered weights may vary by supplier and moisture content.

Diagram

Custom areaPlan view6.0"Depth

Live estimate

Mathematical quantity
12 cu yd
Compaction demand (already applied)
Informational

Aggregate base is specified as a compacted depth. The engine converts loose→compacted once via Advanced options.

Field conditions
Not applied
Adjusted requirement
12 cu yd

What you actually need in the field, before rounding to a supplier-friendly ordering unit.

Ordering rule
Round up to whole ton
Suggested order
12 cu yd

Estimator confidence

Lower

The primary result already includes the compaction factor from Advanced options. Loose delivered volume exceeds the compacted design depth.

Improve confidence: Verify the compaction percentage in Advanced options matches your spec (typical 15–25%).

Why this behavior applies: Aggregate base is specified as a compacted depth, so the loose delivered volume must exceed it. This calculator applies that factor once — in the primary quantity — and the intelligence layer only explains it.

  • Compacted design depth — Order loose volume above the compacted spec.
  • Lift thickness — Deep single lifts compact less uniformly than 4-in lifts.
  • Confirm the required class (Class 2, Type A, etc.) with the geotechnical spec.
  • Compact in 4–6 inch lifts.
  • Test density with a nuclear gauge on structural applications.
  • Substituting the wrong class of base for what the spec called for.
  • Under-compacting and getting rutting under first traffic.
  • Ordering the design volume without accounting for compaction.

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.
  • Enter your dimensions to see live material estimates.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 1.55.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • Road base density: about 1.55 tons per cubic yard.
  • Standard driveway depth: 6 inches compacted.
  • Class-2 base compacts 20–25% from loose volume.

Frequently asked questions

Deeper guidance from the Learn library — sizing, depth, waste, and ordering for this material.

These results are estimates only. Confirm quantities, compaction, waste, and delivery requirements with your supplier or project professional before ordering materials.

Help Improve Yardexa

Help Improve Yardexa

We're constantly improving Yardexa based on feedback from homeowners, landscapers, contractors, and suppliers.