Construction

Aggregate Base Calculator

Calculate crushed aggregate base by area, depth, compaction, and cost.

Inputs

Live estimate

Material needed

7.41 cu yd

Schedule 1 truck load(calculated: 0.62)
Cubic yards
7.41 cu yd
Tons
11.11 tons
Truckloads
0.62
Area
500 sq ft
Cubic feet
166.67

You will likely need

  • 7.41 cu yd — material needed
  • Schedule 1 truck load
  • Approximate delivered weight: 11.11 tons

Supplier tip

Most suppliers sell aggregate base by either the cubic yard or by weight. Confirm your supplier's preferred ordering unit before purchasing.

Weight estimates are based on industry-standard average material densities. Actual delivered weights may vary by supplier and moisture content.

Diagram

Custom areaPlan view4.0"Depth

Live estimate

Mathematical quantity
7 cu yd
Compaction demand (already applied)
Informational

Aggregate base is specified as a compacted depth. The engine converts loose→compacted once via Advanced options.

Field conditions
Not applied
Adjusted requirement
7 cu yd

What you actually need in the field, before rounding to a supplier-friendly ordering unit.

Ordering rule
Round up to whole ton
Suggested order
8 cu yd

Estimator confidence

Lower

The primary result already includes the compaction factor from Advanced options. Loose delivered volume exceeds the compacted design depth.

Improve confidence: Verify the compaction percentage in Advanced options matches your spec (typical 15–25%).

Why this behavior applies: Aggregate base is specified as a compacted depth, so the loose delivered volume must exceed it. This calculator applies that factor once — in the primary quantity — and the intelligence layer only explains it.

  • Compacted vs loose depth — The spec is compacted depth; the truck delivers loose material.
  • Subgrade condition — Soft subgrade absorbs base rock during compaction.
  • Compaction equipment — Plate compactor vs vibratory roller changes the effective factor.
  • Install in 2-inch lifts and compact each lift.
  • Add water to hit optimum moisture — dry base cannot reach target density.
  • Use woven fabric under aggregate on soft native subgrade.
  • Placing base in one thick lift and getting soft spots.
  • Compacting bone-dry aggregate — density will never hit spec.
  • Skipping fabric on soft native soil and watching the base disappear into the subgrade.

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.
  • Enter your dimensions to see live material estimates.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 1.5.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • Aggregate base density: about 1.5 tons per cubic yard.
  • Compact in 2-inch lifts. Loose volume is 15–25% greater than compacted.
  • Common specs: ¾-inch minus, Class-2, DGA (dense graded aggregate).

Frequently asked questions

Deeper guidance from the Learn library — sizing, depth, waste, and ordering for this material.

These results are estimates only. Confirm quantities, compaction, waste, and delivery requirements with your supplier or project professional before ordering materials.