Concrete

Concrete Slab Calculator

Calculate concrete volume for rectangular slabs. Get cubic yards, bags, and cost.

Inputs

Live estimate

Material needed

6.17 cu yd

Schedule 1 truck load(calculated: 0.62)
Area
500 sq ft
Cubic feet
166.67
Cubic yards
6.17
Estimated tons
12.35 tons
Estimated truckloads
0.62
80 lb bags
278

You will likely need

  • 6.17 cu yd — material needed
  • Schedule 1 truck load
  • Approximate delivered weight: 12.35 tons
  • 278 bags

Diagram

Custom areaPlan view4.0"Depth

Live estimate

Mathematical quantity
6.2 cu yd
Placement contingency
+5% → 6.5 cu yd

Small over-excavation, form deflection, and pump / handling loss during placement.

Field conditions
Not applied
Adjusted requirement
6.5 cu yd

What you actually need in the field, before rounding to a supplier-friendly ordering unit.

Ordering rule
Round up to nearest 0.5 cu yd
Suggested order
6.5 cu yd

Estimator confidence

High

Small over-excavation, form deflection, and pump / handling loss during placement.

Improve confidence: Increase for pumped placements or complex forms.

Why this behavior applies: Concrete is a rigid, formed material. The only real adjustment is placement contingency — form deflection, small over-excavation, and pump / bucket loss.

  • Sub-base flatness — A ½-in low spot across 100 sq ft is about ⅙ cu yd of extra concrete.
  • Form deflection — Poorly braced forms bulge under load and drink additional yardage.
  • Whether the pour is pumped — Pump primer and line loss add up to about ¼ cu yd.
  • Verify thickened edges and over-excavation — a 4-inch slab with a 6-inch perimeter thickens the order.
  • Confirm reinforcement (mesh, fiber, or rebar) before scheduling the pour.
  • Have finishing crew and tools on-site before the truck arrives — pour times are unforgiving.
  • Forgetting thickened perimeter edges when computing volume.
  • Ignoring waste and ordering exactly the calculated volume.
  • Skipping isolation and control joints on larger slabs.

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 2.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • Concrete density: 2.0 tons per cubic yard (~4,050 lb).
  • Standard slab thickness: 4 inches; driveways: 5–6 inches.
  • One 80 lb bag ≈ 0.022 cubic yards; ~45 bags per cubic yard.

Frequently asked questions

Deeper guidance from the Learn library — sizing, depth, waste, and ordering for this material.

These results are estimates only. Confirm quantities, compaction, waste, and delivery requirements with your supplier or project professional before ordering materials.