Concrete

Concrete Curb Calculator

Calculate the concrete needed for curbs, edging, and mow strips. Enter your total curb length and cross-section.

Inputs

Live estimate

Material needed

6.17 cu yd

Schedule 1 truck load(calculated: 0.62)
Area
500 sq ft
Cubic feet
166.67
Cubic yards
6.17
Estimated tons
12.35 tons
Estimated truckloads
0.62
80 lb bags
278

You will likely need

  • 6.17 cu yd — material needed
  • Schedule 1 truck load
  • Approximate delivered weight: 12.35 tons
  • 278 bags

Diagram

Custom areaPlan view4.0"Depth

Live estimate

Mathematical quantity
6.2 cu yd
Placement contingency
+5% → 6.5 cu yd

Small over-excavation, form deflection, and pump / handling loss during placement.

Field conditions
Not applied
Adjusted requirement
6.5 cu yd

What you actually need in the field, before rounding to a supplier-friendly ordering unit.

Ordering rule
Round up to nearest 0.5 cu yd
Suggested order
6.5 cu yd

Estimator confidence

High

Small over-excavation, form deflection, and pump / handling loss during placement.

Improve confidence: Increase for pumped placements or complex forms.

Why this behavior applies: Concrete is a rigid, formed material. The only real adjustment is placement contingency — form deflection, small over-excavation, and pump / bucket loss.

  • Form radius — Curved forms deflect more than straight runs.
  • Order in half-yard increments to match ready-mix minimums.
  • Wet-cure for 3+ days to reach full strength.
  • Add expansion joints every 10 feet on long straight runs.
  • Ordering the geometric volume without end and spillage allowance.
  • Skipping expansion joints and getting random cracks.
  • Pulling forms too early and getting sagged edges.

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 2.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • Curbs are treated as a long footing: length × width × height.
  • Typical residential curb: 6 in wide × 6 in tall.
  • Order 10% extra for spillage and screeding losses.

Frequently asked questions

Concrete quantities are estimates. Confirm mix design and reinforcement with your engineer or municipal specs.

Help Improve Yardexa

Help Improve Yardexa

We're constantly improving Yardexa based on feedback from homeowners, landscapers, contractors, and suppliers.