Earthwork

Export Soil Calculator

Calculate soil export: loose (swelled) cubic yards, whole truckloads to dispatch, hauling, and disposal fees.

Inputs

Live estimate

Material needed

23.15 cu yd

Schedule 2 truck loads(calculated: 1.65)
Area
500 sq ft
Cubic feet
500
Cubic yards
18.52
Estimated tons
30.09 tons
Estimated truckloads
1.65
Disposal cost
$800
Total cost
$800

You will likely need

  • 23.15 cu yd — material needed
  • Schedule 2 truck loads
  • Approximate delivered weight: 30.09 tons
  • Estimated total: $800

Diagram

Custom areaPlan view12.0"Depth

Live estimate

Mathematical quantity
23 cu yd
Bank-to-loose swell (already applied)
Informational

Excavation is measured bank, hauled loose. The engine converts bank→loose once via Advanced options.

Field conditions
Not applied
Adjusted requirement
23 cu yd

What you actually need in the field, before rounding to a supplier-friendly ordering unit.

Ordering rule
Round up to whole truckload
Suggested order
24 cu yd

Estimator confidence

Lower

The primary result already includes the swell factor from Advanced options. Truckloads and disposal cost are derived from that loose volume.

Improve confidence: Verify the swell percentage in Advanced options matches your soils report (typical 15–40%).

Why this behavior applies: Excavation is measured as bank volume but hauled loose. This calculator converts bank to loose once — in the primary quantity — and truckloads and disposal both use that loose figure.

  • Swell factor — Bank cubic yards do not equal loose truck volume.
  • Confirm dump site acceptance criteria before excavating — contaminated soil is expensive to move.
  • Match truck size to site access — bigger trucks aren't cheaper if they can't reach the pile.
  • Track loads with tickets — trust but verify at billing time.
  • Ordering trucks based on bank volume without applying swell.
  • Assuming any dump will take any soil.
  • Skipping the ticket audit and paying for phantom loads.

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.
  • You're just over one truckload — a slightly larger truck could save a delivery fee.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 1.3.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • The compaction slider is used as a swell factor here — soil expands 15–25% between bank and loose.
  • Disposal fees vary widely (per-load at private sites, per-ton at municipal transfer stations) — call ahead to confirm the tip rate.
  • Clean fill is often accepted free at active construction sites.
  • Truckloads shown are rounded up in the actionable output — you always dispatch whole trucks.

Frequently asked questions

Deeper guidance from the Learn library — sizing, depth, waste, and ordering for this material.

Confirm disposal site, tip fees, and haul permits before dispatching trucks.