Earthwork

Cut and Fill Calculator

Estimate the difference between cut and fill volumes on a grading job. Enter your area and average cut/fill depth.

Inputs

Live estimate

Material needed

11.11 cu yd

Area
500 sq ft
Cubic feet
250
Cubic yards
9.26
Estimated tons
14.44
Estimated truckloads
0.79

Diagram

Custom areaPlan view6.0"Depth

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.

Need this material?

Compare local supplier quotes.

Coming soon — Yardexa will connect your estimate with vetted local suppliers.

Yardexa AI Estimator

Turn this estimate into a full project bid.

Labor, materials, waste, and margin — generated in seconds. Join the early access list.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 1.3.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • Use the shape/area inputs for the grading footprint.
  • Enter your average cut depth; the calculator returns loose (swelled) volume.
  • For true balance, model cut and fill zones separately.

Frequently asked questions

Local suppliers

Get delivered quotes from suppliers near you.

Yardexa Marketplace connects your estimate with vetted suppliers. Coming soon.

This is a preliminary estimate. Use a survey or grading plan for construction quantities.