Turf

Artificial Turf Base Calculator

Calculate the crushed stone base needed under artificial turf. Volume, tons, and compaction included.

Inputs

Live estimate

Material needed

5.83 cu yd

Area
500 sq ft
Cubic feet
125
Cubic yards
4.63
Estimated tons
8.75
Estimated truckloads
0.49
Material cost
$379
Total cost
$379

Diagram

Custom areaPlan view3.0"Depth

Need this material?

Compare local supplier quotes.

Coming soon — Yardexa will connect your estimate with vetted local suppliers.

Yardexa AI Estimator

Turn this estimate into a full project bid.

Labor, materials, waste, and margin — generated in seconds. Join the early access list.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 1.5.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Professional guidance

When to use

Every artificial turf installation over soil needs a stable, well-drained base.

Recommended depth

3 inches compacted for lawns; 4 inches for pet runs and high-traffic areas.

Pro tip

Compact in 1-inch lifts with a plate compactor and a light water pass — dry base won't compact.

Common mistakes

Skimping on base depth. A weak base shows every high spot and dip in the finished turf surface.

Material assumptions

  • Base rock density: about 1.5 tons per cubic yard.
  • Standard depth: 3–4 inches of compacted class-2 road base or decomposed granite.
  • Base compacts 15–25%. Order extra to hit final depth.

Frequently asked questions

Local suppliers

Get delivered quotes from suppliers near you.

Yardexa Marketplace connects your estimate with vetted suppliers. Coming soon.

These results are estimates only. Confirm quantities, compaction, waste, and delivery requirements with your supplier or project professional before ordering materials.