Raised Bed Soil Calculator

Calculate soil needed for raised garden beds. Get cubic yards, cubic feet, and cost.

Inputs

Live estimate

Material needed

18.52 cu yd

Schedule 2 truck loads(calculated: 1.85)
Area
500 sq ft
Cubic feet
500
Cubic yards
18.52
Estimated tons
16.67 tons
Estimated truckloads
1.85

You will likely need

  • 18.52 cu yd — material needed
  • Schedule 2 truck loads
  • Approximate delivered weight: 16.67 tons

Diagram

Custom areaPlan view12.0"Depth

Live estimate

Mathematical quantity
19 cu yd
Blend settlement (initial order not auto-inflated)
Informational

Compost-rich blends settle further than mineral soil, but timing and magnitude vary. The initial order stays at geometric volume; plan for seasonal top-off separately.

Field conditions
Not applied
Adjusted requirement
19 cu yd

What you actually need in the field, before rounding to a supplier-friendly ordering unit.

Ordering rule
Round up to whole cubic yard
Suggested order
19 cu yd

Estimator confidence

High

Screened topsoil settles after watering and may compact further over the first season. Yardexa does not automatically add a blanket settlement percentage to the initial order; plan a small future top-off rather than over-ordering up front.

Improve confidence: For beds where finish grade must hold immediately, order slightly high and plan a small top-off after the first watering.

Why this behavior applies: Settlement is real but timing-dependent. A single blanket default hides that distinction; the initial order stays at the geometric volume.

  • Blend composition — Compost-heavy blends settle further than mineral blends.
  • Line the bottom with cardboard to suppress weeds — it decomposes into the mix.
  • Fill in 6-inch lifts and lightly wet each lift.
  • Top off with 1–2 inches of compost each spring.
  • Filling with fill dirt or subsoil — vegetables will not thrive.
  • Ordering only the exact geometric volume and running short after settlement.
  • Skipping the compost amendment on the initial fill.

Smart tips

  • Ordering 5–10% extra is standard on irregular layouts. Running short costs more than the excess.
  • You're just over one truckload — a slightly larger truck could save a delivery fee.

How it's calculated

Area is derived from your shape inputs and converted to sq ft.

Depth is converted to feet; cubic feet = area × depth.

Cubic yards = cubic feet ÷ 27, then × (1 + waste %) × (1 + compaction %).

Estimated tons = cubic yards (with waste) × 0.9.

Truckloads = cubic yards (with waste) ÷ truck capacity.

Total cost = cubic yards (with waste) × price per cubic yard + delivery.

Material assumptions

  • Typical raised bed mix: 60% topsoil, 30% compost, 10% aeration (perlite/vermiculite).
  • Minimum depth for most vegetables: 10–12 inches.
  • Soil settles 10–20% in the first season — top off with compost annually.

Frequently asked questions

These results are estimates only. Confirm quantities, compaction, waste, and delivery requirements with your supplier or project professional before ordering materials.